
Black Bank improvements
On Kestrel pond we re-filled peg17 with stone/ gravel and a fallen tree and brambles were removed between pegs 3 and 4.
There are no birds nesting yet and we had a good look.
On Heron pond, we removed the old rotten platform on peg 13, and installed a new larger decking platform. On peg 11 new boards were fitted to front, (requires trimming).
Peg 25 the old rubber matting was removed and plastic pallets were fitted closer to water level.
Enjoy
Nick Craddock
Posted 15/03/25
REPLACE DUMMY CONTENT