News

Maintenance team, 25/09/25
Club News

Maintenance team, 25/09/25

Maintenance team this week at Black Bank, peg 17 on Kestrel pond. We dropped the level down a foot, it now has a step, so wheel chair inaccessible, hopefully will have a digger to alter the slope.

Most pegs on Heron pond, we have boarded fronts due to low levels of water, washing and undercutting platforms, again when we have a digger we will back fill platforms, also a lot of pegs have had a trim, In the water and around bankside. Some trimming to be removed, again digger/ trailer( next week).

We will be working around peg19,18 on Kestrel pond and pegs 1,2 on Heron pond on Wednesday next week, please don’t fish these pegs. Thanks.

Thanks Mark and Ginge Ashmore for your assistance. PS, now drainage on roadside has been cut, getting a few Egrets about.

Nick Craddock
Posted 25/09/25