A bit more work started at Thoresby Bridge. Pegs 6,7and 8 now have the stabilization boards in. These, when levelled will make it 8 permanent pegs above the bridge to the willow tree and 1 below the pump (1a) for this coming season.
There are 5 more to do on the Tetney Lock section and some steps to cut to make 8 in total down there. I’m trying to keep the bank and pegs looking as natural as possible so will strim during the 1st week in June.
Thanks to the investment from our club, this has all been made possible, an ongoing project.
See you on the bank.
Jim Todd