The maintenance team made repairs to bottom steps onto platforms while Darren Roberts (contractor) cut back the vegetation. 6 of the steps repaired as shown. It was a very hot day and needed more materials than expected. Back next Wednesday to repair a further 6.
Posted 15/06/23